North Pemiscot R-1 School District
Lead in Drinking Water
Sampling and Testing Plan
Prepared For:
North Pemiscot R-1 School District
102 School Drive
Wardell, Missouri 63879
Prepared By:
Environmental Works, Inc.
2008 N. Westwood
Poplar Bluff, Missouri 63901
Plan Prepared:
December 28, 2023
Table of Contents
1.0 Purpose........................................................................................................................................1
1.1 Regulatory Schedule Requirements (RSMo 160.077(4)) .................................................................. 1
2.1 School District Information .............................................................................................................. 2
2.2 Buildings ........................................................................................................................................... 2
3.0 Inventory .....................................................................................................................................3
3.1 Outlet Identification and Prioritization ............................................................................................ 3
4.1 Initial Sampling and Testing .............................................................................................................. 4
4.2 Subsequent Sampling and Testing ................................................................................................... 4
APPENDIX B – Building Summary ....................................................................................................... B
APPENDIX C – Outlet Inventory ......................................................................................................... C
Environmental Works, Inc. (EWI), on behalf of the North Pemiscot R-1 School District (Wardell), has prepared this Lead in Drinking Water Sampling and Testing (LDWST) Plan in response to the Missouri Revised Statutes of Missouri (RSMo) Chapter 160 Section 077 (160.077). This LDWST Plan includes procedures for inventorying and sampling outlets used for drinking water and water dispensed for cooking and cleaning of eating and cooking utensils in each of the school buildings.
This Plan has been prepared to meet the requirements of the RSMo 160.077, the Environmental
Protection Agency’s (EPA) 3Ts for Reducing Lead in Drinking Water, and the EPA Safe Drinking Water Act (SDWA). The North Pemiscot R-1 School District has distributed this LDWST Plan to the public through the http://www.northpem.k12.mo.us/. General information on the health effects of lead contamination and additional informational resources for employees and parents of children at each school will be provided upon request.
In accordance with RSMo 160.077, on or before January 1, 2024, each school will:
• Conduct an inventory of all drinking water outlets and all outlets that are used for dispensing water for consumption, cooking, and cleaning of cooking and eating utensils;
• Develop a Plan for testing each outlet inventoried;
• Provide the Plan to the public; and
• Upon request, provide general information on the health effects of lead contamination and additional informational resources for employees and parents of children at each school.
Before August 1, 2024, or on the first day students will be present in the building, whichever is later, each school will:
• Complete sampling in accordance with RSMo 160.077,
• Make all testing results and any lead remediation plans available on the school's website within two weeks of receiving final analytical test results, and
• Remove and replace any drinking water coolers or drinking water outlets that the EPA has determined are not lead-free under the federal Lead Contamination Control Act of 1988.
School Name:
|
North Pemiscot Mustangs |
School District:
|
North Pemiscot R-1 School District |
School Type: |
Public
|
Address:
|
102 School Drive P.O Box 38 Wardell, Pemiscot County, Missouri 63879
|
Phone: |
(573) 628-3471 (O) and (573) 628-3472 (F) |
Email: |
kemmons@northpem.k12.mo.us |
|
|
Contact: |
Ms. Kim Emmons Superintendent (573) 628-3471 (O) |
The following table summarizes the schools covered in this LDWST Plan.
Schools |
Level |
Grade |
Address |
Elementary |
Elementary |
K – 5th |
102 School Drive Wardell, MO 63879 |
Middle School |
Elementary – Secondary |
6th – 8th |
102 School Drive Wardell, MO 63879 |
High School |
Secondary |
9th – 12th |
102 School Drive Wardell, MO 63879 |
North Pemiscot District completed a building and outlet questionnaire, and EWI completed a site visit to gather information such as:
• Date of building construction,
• Year and location of plumbing repairs,
• Location where water enters the building and flow,
• Identification of any known lead lines or plumbing components,
• Location of water pipes and piping material,
• Location of any tanks in the plumbing system,
• Identification of all faucets and fixtures used for drinking water and cooking, and Identification of filters, aerators, signs of corrosion, or banned water cooler tanks.
Drinking water and cooking outlets were identified from the questionnaire and site visit in accordance with the Missouri RSMo’s 160.077.2 drinking water outlet definition, which includes but may not be limited to:
a) A water fountain, faucet, or tap that is used or potentially used for drinking or food preparation and
b) Ice-making and hot drink machines.
Building diagrams are attached in Appendix A, detailed information on each building can be found in Appendix B, and the outlets identified in the inventory are outlined in Appendix C.
The outlet inventory and prioritization schedule included in this plan will be used to conduct sampling for the North Pemiscot District. Samples will be collected using proper sampling procedures. The sampler will utilize laboratory prepared 250-milliliter (mL) unpreserved plastic containers to collect outlet water for analysis of lead by Method 200.8. Samples will be labeled, managed under a Chain of Custody, and sent to a certified laboratory for analysis. EWI personnel will collect samples from each identified outlet based on the following criteria:
First draw samples will be immediately collected from the outlet from the first water after the outlet is turned on. Samples will be collected after a stagnation period of at least 8 hours but no greater than 18 hours.
Follow-up flush samples will be collected from at least 25% of inventoried drinking water outlets.
All results will be summarized in a final report, submitted to the Missouri Department of Health and Senior Services, and published on the North Pemiscot District website.
If initial testing finds lead above 5 parts per billion (ppb), the North Pemiscot District will implement remedial measures, then test and sample 25% of remediated drinking water outlets by first draw and follow-up flush sampling annually.
If initial testing does not find a drinking water source with a lead concentration above 5 ppb, North Pemiscot District will complete testing and sampling every five years.
Appendix B – Building Summary
School District: North Pemiscot R-I
Person Completing Questionnaire: Kim Emmons
Building |
Address |
Original Construction Date |
Outlet Count |
Any Building Additions? |
Where Does Water Enter the Building? |
Who Provides Water to the Building? |
|
Any Tanks in the Plumbing System? |
|
|
Notes |
||
Yes/No |
Year of Addition |
What Was Added? |
Yes/No |
Tank Types (i.e. boiler, water heaters, water chillers etc.) |
Is the tank Lead Lined? |
Location (hall, room #, ect) |
|||||||
Building A |
102 School Drive Wardell, MO 63879 |
1930ish |
4 |
No |
|
|
One enters in the girl's restroom and the other line is under the storage room. |
City of Wardell |
Yes |
two water heaters and two water chillers |
No |
Ceiling of boys/girls restroom; chillers in the hallway |
All plumbing replaced in 2021 |
Elementary |
102 School Drive Wardell, MO 63879 |
1930ish |
4 |
No |
|
|
Water enters underneath the boiler room |
City of Wardell |
Yes |
two water heaters and two water chillers |
No |
Ceiling of boys/girls restroom; chillers in the hallway |
|
Superintendent's Building |
102 School Drive Wardell, MO 63879 |
1930ish |
2 |
No |
|
|
All potable water enters underneath the math classroom |
City of Wardell |
Yes |
one water heater and one water chiller |
No |
Boiler room; water chillers in hallway |
|
Library/Gym |
102 School Drive Wardell, MO 63879 |
Early 2000s |
5 |
No |
|
|
Comes in underneath the storage room and the shut-off valve is in the storage room. |
City of Wardell |
Yes |
Water heater and one chiller |
No |
In the storage room by boys locker room; hallway |
|
Cafeteria |
102 School Drive Wardell, MO 63879 |
1930ish |
4 |
No |
|
|
Wraps around the building and comes in the back storage area |
City of Wardell |
Yes |
Two water heaters one water chiller, expansion tank |
No |
In the back storage room and the kitchen |
|
Facs Cottage |
102 School Drive Wardell, MO 63879 |
Unknown |
8 |
No |
|
|
Comes in underneath the front. |
City of Wardell |
Yes |
One water heater |
No |
In the laundry room |
|
Band Room |
102 School Drive Wardell, MO 63879 |
Unknown |
2 |
No |
|
|
Comes in the north side of the door. |
City of Wardell |
Yes |
One water chiller |
No |
in the hallway |
|
AG Shop |
102 School Drive Wardell, MO 63879 |
1932 |
2 |
No |
|
|
Comes in under the bathroom |
City of Wardell |
No |
|
|
|
All plumbing replaced in 2021 |
FEMA Gym |
102 School Drive Wardell, MO 63879 |
2023 |
3 |
No |
|
|
unknown |
City of Wardell |
No |
|
|
|
|
Baseball Concession Stand |
102 School Drive Wardell, MO 63879 |
unknown |
1 |
No |
|
|
unknown |
City of Wardell |
No |
|
|
|
|
Total Outlets |
25 |
|
|
|
|
|
|
|
|
|
|
Appendix C – Outlet Inventory
School District: North Pemiscot R-I
Person Completing Questionnaires: Kim Emmons
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
Sample ID |
1 |
Fountain |
Hallway |
Building A |
01-01-HW-DW-P-001 |
2 |
Bottle Filler |
Hallway |
Building A |
01-01-HW-BF-P-002 |
3 |
Fountain |
Hallway |
Building A |
01-01-HW-DW-P-003 |
4 |
Bottle Filler |
Hallway |
Building A |
01-01-HW-BF-P-004 |
|
4 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
Sample ID |
5 |
Fountain |
Hallway |
Elementary Building B |
02-01-HW-DW-P-005 |
6 |
Bottle Filler |
Hallway |
Elementary Building B |
02-01-HW-BF-P-006 |
7 |
Fountain |
Hallway |
Elementary Building B |
02-01-HW-DW-P-007 |
8 |
Bottle Filler |
Hallway |
Elementary Building B |
02-01-HW-BF-P-008 |
|
4 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
Sample ID |
|
9 |
Fountain |
Hallway |
Superintendents Building C |
03-01-HW-DW-P-009 |
|
10 |
Bottle Filler |
Hallway |
Superintendents Building C |
03-01-HW-BF-P-010 |
|
|
2 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
Sample ID |
|
11 |
Fountain (offline) |
Gym lobby |
Library/Gym Building D |
04-01- GYM-DW-P-011 |
|
12 |
Fountain |
Gym lobby |
Library/Gym Building D |
04-01- GYM-DW-P-012 |
|
13 |
Bottle Filler |
Gym lobby |
Library/Gym Building D |
04-01- GYM-DW-P-013 |
|
14 |
Ice Machine |
Closet |
Library/Gym Building D |
04-01-GYM-IM-P-014 |
|
15 |
Faucet |
Concession Stand |
Library/Gym Building D |
04-01-CS-KF-P-015 |
|
35 |
Faucet |
Concession Stand |
Concession Stand Building |
10-01-CS-KF-P-035 |
|
|
6 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
Sample ID |
|
16 |
Ice Machine |
Cafeteria |
Cafeteria Building |
05-01-CAFE-IM-P-016 |
|
17 |
Dishwasher |
Kitchen |
Cafeteria Building |
05-01-KIT-DISH-P-017 |
|
18 |
Faucet |
Kitchen |
Cafeteria Building |
05-01-KIT-KF-P-018 |
|
19 |
Faucet |
Kitchen |
Cafeteria Building |
05-01-KIT-KF-P-019 |
|
|
4 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
SAMPLE ID |
|
20 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-020 |
|
21 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-021 |
|
22 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-022 |
|
23 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-023 |
|
24 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-024 |
|
25 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-025 |
|
26 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-026 |
|
27 |
Faucet |
Kitchen |
FACS Cottage (Building F) |
06-01-CR-KF-P-027 |
|
|
8 Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
SAMPLE ID |
|
28 |
Water Fountain |
Hallway |
Band Room |
07-01-HW-DW-P-028 |
|
29 |
Bottle Filler |
Hallway |
Band Room |
07-01-HW-BF-P-029 |
|
|
2 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
SAMPLE ID |
30 |
Fountain |
Lobby |
Gym |
08-01-HW-DW-P-030 |
31 |
Faucet |
Concession Stand |
Gym |
08-01-CS-KF-P-031 |
32 |
Faucet |
Concession Stand |
Gym |
08-01-CS-KF-P-032 |
|
3 |
Total Building Outlets |
|
|
Map ID |
Outlet Type (see examples below) |
Location (hall, room #, etc.) |
Specific Location |
SAMPLE ID |
33 |
Fridge |
Shop |
Ag Shop |
09-01-AG-FRIDGE-P-033 |
34 |
Faucet |
Shop |
Ag Shop |
09-01-AG-CF-P-034 |
|
2 |
Total Building Outlets |
|
|